A time log to keep track of progress.
 

 

 

 

 

 

''Quality means doing it right when no one is looking.'' (Henry Ford)

 

Date                                              Progress
 

15th December 2009               William Wynne Corvair conversion manual ordered.

1st January 2010                         Web site built.

14th January 2010                     1965 Corvair 164 Cubic Inch engine block on its way from the USA.

20th January 2010                    Corvair engine block & 65 shop manual arrived.

20th January 2010                    Plans on the way from Andrew Pietenpol.

5th February 2010                     Ordered LAA approved supplements from Jim Wills.

24th February 2010                  LAA approved supplements from Jim Wills arrive.

5th March 2010                           Tonight I started drawing the Rib template which will then serve as the jig pattern to build the Ribs in. I am using a jig to                                                                               hopefully make sure all the Ribs are built the same.

7th March 2010                           100 x 72" lengths of 1/2" x1/4" Spruce cap strip ordered from Aircraft Spruce in the USA for wing ribs.

14th March 2010                         I have finished drawing the rib template for the jig.

21st March 2010                         Today I had the discovery of the year! I had a tour of a storage facility containing a quantity of aircraft grade spruce just 3                                                                         hours away from me in Newcastle, NSW. 

23rd March 2010                       Spruce cap strip arrived from Aircraft Spruce in the USA for wing ribs.

25th March 2010                       Made the cap strip bending jig and a capped PVC tube to soak the spruce cap strip in so it can be bent. Trialing first strip...........

29th March 2010                       10 top rib cap strips now bent......22 to go.....

30th March 2010                      While still bending cap strips...... I have started screwing the blocks on the rib template to hold the capstrip in place for                                                                                 glueing.....

1 - 4 April 2010                           Attended Natfly in Temora for the annual fly in. Lots of plane porn!

10th April 2010                           Made the jig to bend the bottom capstrip of the ribs. Nearly finished bending the top strips then start bending 32 of the bottom                                                              strips. The jigs only hold 3 strips at a time so takes a while.....

11th April 2010                           Assembled first rib. Will now use these parts as patterns to cut out capstrip for all 32 ribs..... Started cleaning the little rust that                                                                 has accumulated on the cylinder studs on the Corvair block. Will get these cleaned up and prime them.....

15th April 2010                         Last two pieces of top rib cap strip soaked and bent!.....Now bottom to go.... My handy wood working friend carefully planed 2                                                                   blocks of wood to exact measurements for the jig where the spars will fit through the ribs. Once I have glued all the ribs I will                                                                     send these to the chap I am buying the spruce from so the spars can be planed to the same dimensions. Thanks Norm for your                                                             hard work!

15th April 2010                         All top capstrip are cut to fit and started on the other rib pieces.....there are a lot of little pieces in one rib!...x 32!...

26th April 2010                        At the moment its too labour intensive to detail every day. I am currently spending as much time as I can each day cutting out                                                            rib parts till I have a full set, then will start gluing.

7th May 2010                           All capstrips are cut for the ribs. Waiting on ply to arrive so ribs can be assembled. Just ordered the flight instruments today.

10th May 2010                         According to the Fed-Ex site, my T-88 Glue, Nails & Instruments are vacationing briefly in Honolulu! So I made a mock up of the                                                              hinge arrangment for the elevators and rudder using AN eyebolts.

12th May 2010                         Instruments, Glue and Nails have landed...

15th May 2010                         Measured all the gusset's on the rib so I can cut the ply in to strips on a table saw. I am still trying to source a reasonably priced                                                              supplier of AS2272 AA-A Bond Marine Grade Hoop Pine ply in 1.5mm.....There are a total of 1088 gussets to be cut out!

28th May 2010                        Progress again! Zenith Timber Industries in Queensland are going to supply me with the Ply! They are waiting approx 2-3 weeks                                                            for the 1.5mm sheets to come in and Dave Brown who runs a laser cutting business cutting Radio Control plane kits has kindly                                                                offered to collect it when he is up there....Good stuff!

24th June 2010                      Progress again! I received a box full of used Corvair Parts from Fred in the USA. These parts can all be cleaned up and reused.                                                                  Things like valve covers, cylinder shrouds and many more! Thanks Mate!

4th July 2010                           Started soaking the push rod tubes in solvent degreaser. They are coming up well! Once degreased I am cleaning the surface                                                                rust off with a wire brush wheel and then will paint them.

5th July 2010                           Dave Brown arrived today with some sheets of AS2272 AA-A Bond Hoop Pine Ply. Thanks Mate!...Just waiting on the 1.5mm sheets                                                          which were held up by the Mill. I need the 1.5mm to make the rib gussets.

6th July 2010                           Corvair valve covers and cylinder cooling baffles gone into the Chromers to be cleaned and the valve covers chromed and the                                                            baffles zinc coated and then I will paint them.

18th July 2010                         Collected the Spruce for the Empenage today...

28th July 2010                        Cut and glued the leading and trailing edges of the rudder. Rather than rebating a single piece I am using two pieces cut to size                                                            and glueing them together.

8th August 2010                    Framed up the rudder ready for gluing... Holes have been drilled in the leading edge of the rudder for the AN Eyebolt hinges..

21st August 2010                   Rudder gussets and ribs cut out. Glued the Rudder frame and one side of gussets and ribs.

23rd August 2010                 Turned Rudder over and glued rest of gussets and ribs. Rudder complete!

18th September 2010        Glued Vert stab main frame

25th September 2010       Laminated spruce sections to make the top Vertical stab section. Sorted the cut spruce in to components for the horizontal stab                                                         and elevators.

26th September 2010       Cut out & glued Vert stab top section and right side ribs. Painted other side of Corvair cooling baffles.

27th September 2010       Built Elevator jig.

12th October 2010               1.5mm Ply has arrived so rib building can continue.

17th October 2010               Glued right elevator frame & started cutting rib gussets.

31st October 2010               Glued right elevator ribs.

11th November 2010          Framed up left elevator.

5th February 2011               Cut horizontal stabiliser leading & trailing edges.

13th February 2011             Glued left elevator frame.

6th March 2011                     Draw out rib gussets to be cut.

15th March 2011                   Cut out wing rib gussets with hole saw.

25th March 2011                  Sanding gussets in the drill ready for glueing the first rib...

26th March 2011                  Rib 1 glued & left elevator ribs glued...

29th March 2011                  Rib 2 glued...

30th March 2011                  Rib 3 glued...

1st April 2011                           Rib 4 glued...

2nd April 2011                        Rib 5 glued & left elevator gussets glued...

3rd April 2011                         Right elevator gussets glued...

4th April 2011                         Rib 6 glued...

6th April 2011                         Rib 7 glued...

9th April 2011                         Rib 8 glued...

10th April 2011                        Rib 9 glued...

12th April 2011                        Rib 10 glued...

13th April 2011                        Rib 11 glued...

14th April 2011                        Rib 12 glued...

15th April 2011                        Rib 13 glued...

16th April 2011                        Rib 14 glued...

17th April 2011                         Rib 15 glued...

26th April 2011                       Rib 16 glued...

30th April 2011                       Rib 17 glued...

1st May 2011                            Rib 18 glued...

3rd May 2011                          Rib 19 (A) glued... Upon inspection, a hairline crack was noted so this rib is scrap. Will make a nice wall talking point!

7th May 2011                           Rib 19 (B) glued...

8th May 2011                          Rib 20 glued...

10th May 2011                         Rib 21 glued...

11th May 2011                          Rib 22 glued...

12th May 2011                         Rib 23 glued...

14th May 2011                         Rib 24 glued...

15th May 2011                         Rib 25 glued...

16th May 2011                         Rib 26 glued...

4th June 2011                         Rib 27 glued...

5th June 2011                         Rib 28 glued...

10th June 2011                       First spoked wheel laced and trued......

13th June 2011                       Rib 29 glued...

15th June 2011                       Rib 30 glued...

25th June 2011                      Rib 31 glued...

3rd July 2011                           Rib 32 glued...

9th July 2011                           Horizontal stabiliser trailing edge glued...

10th July 2011                         Horizontal stabiliser leading edge glued...

7th August 2011                    Horizontal stabiliser glued together...

14th August 2011                  Horizontal stabiliser removed from jig & Rib 9 right gussets glued...

2nd June 2012                       Cut 4130 tube pieces for front rudder pedals, bell crank & control system...

30th June 2012                     Further cutting of 4130 sheet metal parts for the control stick hinge setup...

18th December 2012         Lay out left fuselage side. Glue and nail gussets...

25th December 2012        Lay out right fuselage side. Glue and nail gussets...

27th January 2013             Trim and sand both fuselage sides...

28th January 2013            Stand fuselage sides up and start joining them...

2nd February 2013            Start glueing the floor cross braces and front seat back...

15th February 2013            Floor glued on ...

20th February 2013           Fuselage removed from building bench...

21st February 2013             Further fitting out of fuselage...

23rd February 2013           Instrument stiffeners, rear seat back and top stringers glued in...

3rd March 2013                    Building and fitting seats to fuselage...

13th April 2013                       Made cardboard mockups of the turtle deck formers...

14th April 2013                      After checking angles on the mockups, I made the turtle deck formers from ply...

12th May 2013                       Lined the horizontal stab and glued the rear turtle deck former...

19th May 2013                       Made the front turtle deck former and parcel tray door...

25th May 2013                      Glued the front section of the turtle deck to the fuselage...

2nd June 2013                      Fitted brass hinges and ring pull to turtle deck parcel tray door and glued the first stringer in place ...

6th June 2013                       Made and glued the turtle deck centre supports...

9th June 2013                       Cut in and glued the remaining turtle deck stringers...

12th June 2013                      Sanded the ends of the turtle deck stringers...

23rd June 2013                     Glued in Ash piece for mounting tail wheel...

29th June 2013                    Cut out the instrument panels and frame work...

20th July 2013                      Fitted Avon Speedmaster 21" tyres...

21st July 2013                        Cut out instrument access door on head rest in front cockpit. Start bending and fitting undercarriage metal fittings...

9th November 2013         Turned fuselage upside down and marked axle location ready to build gear...

17th November 2013        Right hand side mock gear legs fitted...

14th December 2013        Made a Trip to the Hunter Valley to select the Spruce planks for the wing spars and undercarriage legs...

18th January 2014             Ripping down the Spruce planks to make the undercarriage legs...

1st February 2014               Spruce undercarriage legs and Ash blocks cut and fitted...

1st March 2014                     TIG welded front rudder pedals and further work on the metal gear fittings...

23rd March 2014                Undercarriage spreader bars made and fitted along with gear cable fittings...

30th March 2014                On her own 3 feet! Flipped fuselage over and fitted wheels...

28th June 2014                    Undercarriage tension cables made and fitted with Nicopress fittings and 1/8 cable...

12th July 2014                       Made instument panel mounting frames...

28th September 2014     Front rudder pedals and control crank TIG welded...

11th November 2014         Elevator control crank mounted to fuselage and building front instrument panel...

23rd Novemeber 2014    Fuselage engine mount metal fittings installed...

8th June 2015                       Finish front instrument panel...

20th June 2015                    Started building right outer wing section rear spar...

27th June 2015                    Started building left outer wing section rear spar...

4th July 2015                        Started building outer wing section front spars...

5th October 2015              Centre section front and rear spars built...

29th March 2016                Corvair engine block arrived in Sydney...

2nd April 2016                      Lower cabane strut fittings made and drilled...

8th April 2016                       Road trip to Sydney to collect Corvair engine block...

16th April 2016                     Lower cabane strut fittings bolted to fuselage and cabane strut lower bolt bearing TIG welded...

8th May 2016                       Lower control stick fittings TIG welded...

25th June 2016                   Safety shaft and hybrid studs fitted to Corvair engine...

17th July 2016                      Permanently attached firewall...

21st August 2016               1-3-5 cylinder head tourqed, pushrod tubes fitted and balancer torqued...

3rd Oct 2016                        Tail mounting brackets made and fitted...

23rd Oct 2016                     2-4-6 cylinder head tourqed & pushrod tubes fitted...

13th Nov 2016                     Tail cable mounting fittings made and fitted...